Intel MFSYS25V2 Specification Update - Page 33
Hardware Installations Upgrades, Before You Begin, Tools and Supplies Needed, Chassis References - review
View all Intel MFSYS25V2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 33 highlights
2 Hardware Installations and Upgrades Before You Begin Before working on your server system, review the safety and ESD information at the beginning of this manual and in the appendices. Tools and Supplies Needed • Phillips* (cross head) screwdriver (#1 bit and #2 bit) • Needle-nosed pliers • A ruler • Pen or pencil • Anti-static wrist strap and conductive foam pad (recommended) Chassis References All references to left, right, front, top, and bottom are based on the reader facing the front of the chassis as it would be positioned for normal operation. Installing the Intel® Modular Server System MFSYS25/MFSYS35 in a Rack The Intel® Modular Server System MFSYS25/MFSYS35 is designed for fixed mount rack installation only; all service events will be performed from either the front or back of the system. Caution: When removing the system from its packaging, DO NOT lift the system by the power supply or fan module handles. Installation Guidelines • Review the safety and ESD information at the beginning of this manual and in the appendices. • Use a mechanical lift to install the Intel® Modular Server System MFSYS25/ MFSYS35 in a rack cabinet. • When lifting the system, DO NOT lift by the power supply or fan module handles. • All compute modules, hard drives, power supply modules, I/O modules, and cooling modules should be removed before placing the Intel® Modular Server System MFSYS25/MFSYS35 in a rack. Intel® Modular Server System Service Guide 17