KitchenAid KXU2830YSS Installation Guide - Page 9

Installation Instructions, Interior-mounted Vent Motor

Page 9 highlights

INSTALLATION INSTRUCTIONS INTERIOR-MOUNTED VENT MOTOR Venting Methods Determine which venting method is best for your application. Vent system can terminate either through the wall or floor. Island Location-Vent System Installed Under a Concrete Slab Using PVC Sewer Pipe Island Location Front (Standard)-Mounted Blower Motor Rear-Mounted Blower Motor Front (Standard)-Mounted Blower Motor B A D M C E F G A A L H K J I A. Down vent NOTE: For island locations, a front or rear mounted blower motor can also be mounted for right or left venting if needed for your application. Most island applications would still require the venting to be directed down through the floor. Built-In Cabinet Locations Rear-Mounted Blower Motor B A D M C L E F G H A B A. Down vent B. Left vent C. Right vent K J I A. Wall cap B. 6" (15.2 cm) round metal vent C. 16" (40.6 cm) maximum D. 6" (15.2 cm) round PVC sewer pipe E. 6" (15.2 cm) round metal vent transition with damper (supplied) F. 6" (15.2 cm) round PVC coupling G. Concrete slab H. 6" (15.2 cm) round PVC sewer pipe I. 6" (15.2 cm) round 90° PVC sewer pipe elbow J. Tightly pack gravel or sand completely around pipe. K. 6" (15.2 cm) round 90° PVC sewer pipe elbow L. 6" (15.2 cm) round PVC coupling M. 12" (30.5 cm) minimum C 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

9
INSTALLATION INSTRUCTIONS
INTERIOR-MOUNTED VENT MOTOR
Venting Methods
Determine which venting method is best for your application.
Vent system can terminate either through the wall or floor.
Island Location
NOTE:
For island locations, a front or rear mounted blower motor
can also be mounted for right or left venting if needed for your
application. Most island applications would still require the
venting to be directed down through the floor.
Built-In Cabinet Locations
Island Location—Vent System Installed Under a Concrete
Slab Using PVC Sewer Pipe
Front (Standard)-Mounted Blower Motor
Rear-Mounted Blower Motor
Front (Standard)-Mounted
Blower Motor
Rear-Mounted Blower
Motor
A. Down vent
A. Down vent
B. Left vent
C. Right vent
A
A
B
C
A
A. Wall cap
B. 6" (15.2 cm) round metal vent
C. 16" (40.6 cm) maximum
D. 6" (15.2 cm) round PVC sewer pipe
E. 6" (15.2 cm) round metal vent transition with damper (supplied)
F. 6" (15.2 cm) round PVC coupling
G. Concrete slab
H. 6" (15.2 cm) round PVC sewer pipe
I. 6" (15.2 cm) round 90° PVC sewer pipe elbow
J. Tightly pack gravel or sand completely around pipe.
K. 6" (15.2 cm) round 90° PVC sewer pipe elbow
L. 6" (15.2 cm) round PVC coupling
M. 12" (30.5 cm) minimum
A
B
C
D
E
F
G
H
I
J
K
L
M
A
B
C
D
E
F
G
H
I
J
K
L
M