LG LSD4913ST Owners Manual - Page 13
Installation - dual fuel range
View all LG LSD4913ST manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
ENGLISH INSTALLATION 13 INSTALLATION Product Specifications The appearance and specifications listed in this manual may vary due to constant product improvements. Oven Range Models Description Electrical requirements Exterior Dimensions Height to cooking surface Net weight Total capacity LSD4913 Dual Fuel Range 4.2 kW 120/240 VAC or 3.2 kW 120/208 VAC 29 7/8" (W) x 37 7/8" (H) x 26 1/2" (D) (D with door closed) 75.7 cm (W) x 96 cm (H) x 67.3 cm (D) (D with door closed) 36" (91.4 cm) 181 lb (82.0 kg) Total cap.: 6.3 cu. ft. Before Installing the Range Make sure your range is properly installed and grounded by a qualified installer, according to the installation instructions. Any adjustment and service should be performed only by qualified gas range installers or service technicians. In the Commonwealth of Massachusetts •• This product must be installed by a licensed plumber or gas fitter. •• When using ball type gas shut-off valves, they must be the T-handle type. •• When using a flexible gas connector, it must not exceed 3 feet in length. Preparing for Installation Tools Needed Phillips screwdriver Flat-blade screwdriver Pencil and ruler Open-end or adjustable wrench Pipe wrench (2) (one for support) Materials You May Need •• Gas line shut-off valve •• Pipe joint sealant that resists action of natural and LP gases •• Flexible metal appliance connector (3/4" or 1/2" NPT x 1/2" I.D.) Never use an old connector when installing a new range. •• Flare union adapter for connection to gas supply line (3/4" or 1/2" NPT x 1/2" I.D.) •• Flare union adapter for connection to pressure regulator on range (1/2" NPT x 1/2" I.D.) •• Liquid leak detector or soapy water •• Lag bolt or 1/2" O.D. sleeve anchor (for concrete floors only) Level