LG WKHC202HBA Owners Manual - Page 80
Three-Wire Direct Wire
View all LG WKHC202HBA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 80 highlights
16 INSTALLATION 4 Attach the two hot leads (black and red) of the power cord to the outer terminal block screws. 5 Attach the neutral (white) wire to the center terminal block screw. 6 Connect the external ground (if required by local codes) to the green ground screw. 7 Tighten all screws securely. 8 Reinstall the terminal block access cover. 1'' (2.5 cm) 2 Remove the terminal block access cover on the upper back of the appliance. 3 Install UL-listed strain relief into the power cord through-hole. 4 Thread the 3-wire, #10 AWG minimum copper conductor power cable prepared in step 1 through the strain relief. a White Wire from Dryer Harness b Hot Leads of Power Cord (Black and Red) c Neutral Wire (White) d External Ground Wire (If required by local codes) e Ground Screw (green) Three-Wire Direct Wire • A 3-wire connection is NOT permitted on new construction after January 1, 1996. • A UL-listed strain relief is required. • Use UL-listed 3-wire, #10 AWG minimum copper conductor cable. Allow at least 5 ft. (1.5 m) length to allow for removal and installation of dryer. 1 Remove 3.5 inches (8.9 cm) of the outer covering from the wire. Strip 1 inch (2.5 cm) insulation from each wire. Bend the ends of the three wires into a hook shape. a Terminal block b UL-listed strain relief c UL-listed 3-wire power cord 5 Attach the two hot leads (black and red) of the power cord to the outer terminal block screws. 6 Attach the neutral (white) wire to the center terminal block screw. 7 Connect the external ground (if required by local codes) to the green ground screw. 8 Tighten all screws securely. 9 Reinstall the terminal block access cover. a Hot lead (black and red)