Lenovo B345 IdeaCentre B345-B545 All-In-One Hardware Maintenance Manual - Page 65
Model, DIP 1, LTM230HT10 M01, LM230WF5-TLF1, M230HGE-L20 C1
View all Lenovo B345 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 65 highlights
Step 22. Push the pins that secure the power switch board to the front bezel, and then lift out the power switch board as shown. Step 23. To install the new the LED panel: a. Install the power switch board to the new front bezel. b. Connect the converter cable to the connector on the new LED panel, and attach the converter cable to the LED panel properly using double faced adhesive tape. c. Line up the chassis with the mounting holes on the front bezel, connect the touch control cable and LVDS cable to the connectors on the new LED panel, and then place the chassis into position. d. Connect the converter cable to the converter. e. Connect the front function board cable, front indicator board cable and the power switch board cable to the connectors on the motherboard. f. Reattach the Wi-Fi antenna cables back to the front bezel. g. Secure the new LED panel to the chassis with four screws. h. Secure the chassis to the front bezel with the eight screws. i. Reinstall the camera and the Bluetooth module. j. To get the best display quality for your monitor, adjust the PTV139 DIP switch settings on the TV scalar board according the below chart for different panel models: Note: 1=OFF 0=ON Size Model DIP 1 DIP 2 DIP 3 DIP 4 LTM230HT10 M01 1 1 1 0 LTM230HT10 M02 1 1 0 1 23'LED LM230WF5-TLF1 1 1 0 0 M230HGE-L20 C1 1 0 1 1 23'FPR LM230WF8-TLA1 1 0 1 0 Chapter 8. Replacing hardware 59