LiftMaster LA400UL Installation Manual - Page 22

Step 10 Power Wiring, Solar Applications, Direct Plug-in Transformer 120 Vac

Page 22 highlights

INSTALLATION Step 10 Power Wiring SOLAR APPLICATIONS: For solar applications refer to Solar Panels section in the Appendix. Follow the directions according to your application. NOTE: All power wiring should be on a dedicated circuit, calculated using NEC guidelines. Local codes and conditions must be reviewed for suitability of wire installation. 1. Turn off the AC power from the main power source circuit breaker. 2. Run the AC power wires to the control box. 3. Remove the junction box cover. 4. Connect the green wire to the earth ground rod wire using a wire nut. 5. Connect the white wire to NEUTRAL using a wire nut. 6. Connect the black wire to HOT using a wire nut. 7. Replace the junction box cover. Ensure the wires are not pinched. 8. Plug the J15 plug into the control board. The control board will power up. NOTE: You may see a small spark when plugging the J15 plug into the board. 9. Turn ON AC power to the operator. OPERATOR POWER SOURCE DIRECT PLUG-IN TRANSFORMER (120 VAC) Wire Gauge 14 350 feet (107 m) Wire Gauge 12 525 feet (160 m) Wire Gauge 10 850 feet (259 m) OR EXTERNAL PLUG-IN TRANSFORMER (24 VAC) Wire Gauge 18 150 feet (46 m) Wire Gauge 16 250 feet (76 m) Wire Gauge 14 400 feet (122 m) Wire Gauge 12 600 feet (183 m) Wire Gauge 10 1,000 feet (305 m) NOTE: Use copper conductors ONLY. All control wiring used to connect external devices to Class 2 circuits of the operator must be (QPTZ) Power-Limited Circuit Cables, Type CL2, CL2P, CL2R, or CL2X or other cable with equivalent or better electrical, mechanical, and flammability ratings. 22

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

22
Step 10 Power Wiring
SOLAR APPLICATIONS:
For solar applications refer to Solar Panels
section in the Appendix. Follow the directions according to your
application.
NOTE:
All power wiring should be on a dedicated circuit, calculated
using NEC guidelines. Local codes and conditions must be reviewed for
suitability of wire installation.
1.
Turn off the AC power from the main power source circuit breaker.
2.
Run the AC power wires to the control box.
3.
Remove the junction box cover.
4.
Connect the green wire to the earth ground rod wire using a wire
nut.
5.
Connect the white wire to NEUTRAL using a wire nut.
6.
Connect the black wire to HOT using a wire nut.
7.
Replace the junction box cover. Ensure the wires are not pinched.
8.
Plug the J15 plug into the control board. The control board will
power up. NOTE: You may see a small spark when plugging the J15
plug into the board.
9.
Turn ON AC power to the operator.
OPERATOR POWER SOURCE
DIRECT PLUG-IN TRANSFORMER (120 VAC)
Wire Gauge 14
350 feet (107 m)
Wire Gauge 12
525 feet (160 m)
Wire Gauge 10
850 feet (259 m)
OR
EXTERNAL PLUG-IN TRANSFORMER (24 VAC)
Wire Gauge 18
150 feet (46 m)
Wire Gauge 16
250 feet (76 m)
Wire Gauge 14
400 feet (122 m)
Wire Gauge 12
600 feet (183 m)
Wire Gauge 10
1,000 feet (305 m)
NOTE:
Use copper conductors ONLY.
All control wiring used to connect external devices to Class 2 circuits of the operator must be (QPTZ) Power-Limited Circuit Cables, Type CL2, CL2P,
CL2R, or CL2X or other cable with equivalent or better electrical, mechanical, and flammability ratings.
INSTALLATION