Maytag MEDB850WB Installation Instructions - Page 10
relief, direct, ground
UPC - 883049179285
View all Maytag MEDB850WB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
to strain relief ground wire and neutral wire Put direct wire cable through the strain relief. The strain relief should have a tight fit with the dryer cabinet and be in a horizontal position. Tighten strain relief screw against the direct wire cable. if your wiring looks like this: 4-wire direct connection: Go to "4-Wire Direct Connection" on this page. Remove center terminal block screw (B). Remove neutral ground wire (E) from external ground conductor screw (A). and neutral wire 3-wire direct connection: Go to "3-Wire Direct Connection" on page 11. 4=WIRE DIRECT WiRE CONNECTION iMPORTANT: A 4-wire connection is required for mobile homes and where local codes do not permit 3-wire connections. 1, Prepare your 4-wire cable for direct connection Connect neutral ground wire (E) and place hooked end (hook facing right) of neutral wire (white or center wire) (C) of direct wire cable under center screw of terminal block (B). Squeeze hooked ends together and tighten screw. Direct wire cable must have 5 ft. (1.52 m) of extra length so dryer may be moved if needed. Strip 5" (127 mm) of outer covering from end of cable, leaving bare ground wire at 5" (127 mm). Cut 11/2" (38 mm) from remaining 3 wires. Strip insulation back 1" (25 mm). Shape ends of wires into hooks. Connect ground wire (green or bare) (F) of direct wire cable to external ground conductor screw (A). Tighten screw. 10