Maytag MEDB955FW Installation Guide - Page 4

Installation Requirements - model

Page 4 highlights

INSTALLATION REQUIREMENTS TOOLS AND PARTS Gather the required tools and parts before starting installation. Read and follow the instructions provided with any tools listed here. Tools needed for all installations: Flat-blade screwdriver Adjustable wrench that opens to 1" (25 mm) or hex-head socket wrench Level Vent clamps Plastic putty knife Caulking gun and compound (for installing new exhaust vent) Tin snips (new vent installations) 1/4" (6 mm) nut driver (recommended) Tools needed for gas installations: 8" (203 mm) or 10" (254 mm) pipe wrench 8" (203 mm) or 10" (254 mm) adjustable wrench (for gas connections) Pipe-joint compound resistant to LP gas Parts supplied (all models): Leveling legs (4) Parts supplied (steam models): "Y" connector Short inlet hose Rubber washer (4) Parts package is located in dryer drum. Check that all parts are included. Parts needed (steam models): #2 Phillips screwdriver Wire stripper (direct wire installations) Tape measure 4 Pliers 5' (1.52 m) inlet hose If using a power supply cord: Use a UL-listed power supply cord kit marked for use with clothes dryers. The kit should contain: ■■ A UL-listed 30-amp power supply cord, rated 120/240 volt minimum, with a temperature rating of 140°F (60°C) minimum. The cord should be type SRD or SRDT and be at least 4 ft. (1.22 m) long. The wires that connect to the dryer must end in ring terminals or spade terminals with upturned ends. ■■ A UL-listed strain relief.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

4
TOOLS AND PARTS
Gather the required tools and parts before starting
installation. Read and follow the instructions provided
with any tools listed here.
Tools needed for all installations:
Level
#2 Phillips screwdriver
Wire stripper (direct wire
installations)
Parts supplied (all models):
Flat-blade screwdriver
Adjustable wrench that
opens to 1" (25 mm)
or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and
compound (for installing
new exhaust vent)
Vent clamps
1/4" (6 mm) nut driver
(recommended)
Tools needed for gas installations:
8" (203 mm) or 10"
(254 mm) pipe wrench
8" (203 mm) or 10"
(254 mm) adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to LP gas
Plastic putty knife
INSTALLATION REQUIREMENTS
Leveling legs (4)
Tape measure
Pliers
Parts supplied (steam models):
“Y” connector
Short inlet hose
5' (1.52 m) inlet hose
Rubber washer (4)
Parts needed (steam models):
Parts package is located in dryer drum. Check that all parts
are included.
If using a power supply cord:
Use a UL-listed power supply cord kit marked for use with
clothes dryers. The kit should contain:
A UL-listed 30-amp power supply cord, rated 120/240
volt minimum, with a temperature rating of 140°F (60°C)
minimum. The cord should be type SRD or SRDT and be
at least 4 ft. (1.22 m) long. The wires that connect to
the dryer must end in ring terminals or spade terminals
with upturned ends.
A UL-listed strain relief.