Maytag MEDX6STBW Installation Guide - Page 12
wire Direct Wire Connection, Optional 3-wire Connection
View all Maytag MEDX6STBW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
3-wire Direct Wire Connection Use where local codes permit connecting cabinet-ground conductor to neutral wire. 6. Connect neutral wire C 3. Prepare your 3-wire cable for direct connection (251m" m) B (893m½m" ) Direct wire cable must have 5 ft. (1.52 m) of extra length so dryer may be moved if needed. Strip 31/2" (89 mm) of outer covering from end of cable. Strip insulation back 1" (25 mm). If using 3-wire cable with ground wire, cut bare wire even with outer covering. Shape wire ends into hooks. 4. Connect wires to terminal block Place hooked end of neutral wire (white or center) (C) of direct wire cable under center terminal block screw (B). Squeeze hooked end together. Tighten screw. 7. Connect remaining wires To connect wires to terminal block, place hooked end of wire under terminal block screw, facing to the right, squeeze hooked end together and tighten screw. 5. Remove center screw B Remove center terminal block screw (B). Place hooked ends of remaining direct wire cable wires under outer terminal block screws (hooks facing right). Squeeze hooked ends together and tighten screws. Finally, reinsert tab of terminal block cover into slot of dryer rear panel. Secure cover with hold-down screw. Now, go to Venting Requirements. Optional 3-wire Connection You must verify with a qualified electrician that this grounding method is acceptable before connecting. 1. Prepare to connect neutral ground wire and neutral wire E A B Remove center terminal block screw (B). Remove neutral ground wire (E) from external ground conductor screw (A). 12