NEC LED-FA019i2 User Manual - Page 41
Assemble Components
![]() |
View all NEC LED-FA019i2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
6 ASSEMBLE COMPONENTS Notice Read the safety guidelines, which are included in the delivery. Follow them strictly to ensure safety and a high-performance LED system! 6.1 Install Mounting bars for Wall Mounting This section is a guide to the mounting of the Mounting bar and describes the following in more detail: Prepare the support structure according to the installation site requirements. Prepare the wall for installation. Then fix the structure on its designated place according to the static requirements. Table 6: Mounting bar - Installation requirements No. of People 2 Tools Ladder/ elevated working platform Tools for mounting (e.g. hammer, screwdriver, Allen key, jaw spanner) Drilling equipment (e.g. drilling machine depending on mounting surface, and fitting attachment/head) wall material/condition Mounting material (screws, dowels etc.) depending on overall weight of chosen screen system mounting surface, wall material/condition Measurement tools (e.g. rule, spirit level) Alignment bar Included in delivery, flat black bar Equipment See for 3.3 Framesets for Bundles specifications related to: Frameset for LED-FA012i2-110 and LED-FA019i2-110 (4×4 Modules) Frameset for LED-FA015i2-137 (5×5 Modules) Frameset for LED-FA019i2-165 (6×6 Modules) Frameset for LED-FA012i2-220 and LED-FA025i2-220, LED-FA038i2-220 (8×8 Modules) 6.1.1 Prepare the Wall Surface Remove debris and clean the wall surface. Measure the dimensions for the bundle according to wall frame specifications for the target frameset: 4×4, 5×5, 6×6, 8x8. Notice Ensure proper ventilation of the LED Wall. For more information, see 3.6 Ventilation Requirements. Consider the cable plans, see 15.1 Cable Plans and ensure the cables can be placed properly. 41
![](/manual_guide/products/nec-ledfa009i2-user-manual-a94b5b9/41.png)