NEC NP400 NP310 : NP600CM Mount Instructions - Page 5
Warning
UPC - 805736024401
View all NEC NP400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Installation To Wood Joist Ceilings WARNING • Tighten wood screws so that projector mount assembly is firmly attached, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding power. • Never tighten in excess of 80 in • lb (9 N.M.). • Make sure that mounting screws are anchored into the center of the studs. The use of an "edge to edge" stud finder is highly recommended. 2 Place projector mount assembly (A) on ceiling as a template and mark the center of the two mounting holes. Make sure that the mounting holes are in the center of the wood joist. Drill two 5/32" (4 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach projector mount assembly (A) with two #14 x 2.5" (6 mm x 65 mm) wood screws (F) and two flat washers (E) as shown in figure 2.4 or figure 2.5 depending on joist orientation. Tighten wood screws (F) using 3/8" (10 mm) socket wrench, phillips screwdriver or 10mm open end wrench until projector mount assembly (A) is firmly attached. Skip to step 3. WOOD JOIST ACCESS SLOT FOR OPEN END WRENCH ALLOWS TIGHTENING OF WOOD SCREW (F) WITHOUT REMOVING PROJECTOR WOOD JOIST FRONT OF MOUNT A E A FRONT OF MOUNT F fig. 2.4 E F fig. 2.5 Visit the Peerless Web Site at www.peerlessmounts.com 5 of 10 ISSUED: 08-05-08 SHEET #: 056-9008-1 For customer care call 1-800-865-2112 or 708-865-8870.