Netgear GSM7228PS 7000 Series Managed Switch Administration Guide for Software - Page 314
Add, Remove, or Replace a Stack Member, Add Switches to an Operating Stack
UPC - 606449071696
View all Netgear GSM7228PS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 314 highlights
ProSafe 7000 Managed Switch Release 8.0.3 a. Select Maintenance > Reset > Device Reboot. A screen similar to the following displays. b. In the Reboot Unit No. list, select 2. c. Click Apply. Add, Remove, or Replace a Stack Member Add Switches to an Operating Stack 1. Make sure the redundant stack connection is in place and functional. All stack members should be connected in a logical ring. 2. Preconfigure the new switches, if desired. 3. Power off all new switches that will be joining the stack. CAUTION: If you cable one or more powered-on switches to the stack, the existing stack and the new switches assume two stacks are merging. They elect a single, new stack master, and you cannot specify which switch becomes the new master. All stack members assume configuration based on the new stack master. Stack members change their stack member numbers to the lowest available numbers. 4. Install the new switches in the rack. This procedure assumes installation below the bottom-most switch, or above the top-most switch. 5. Disconnect the redundant stack cable that connects the last switch in the stack back up to the first switch in the stack at the position in the ring where the new switch is to be inserted. Note: If you want to merge an operational stack into the this stack, add the switches as a group by unplugging one stacking cable in the operational stack and physically connecting all unpowered units at that point. 314 | Chapter 18. Switch Stacks