Netgear M4100-12GF Hardware Installation Guide - Page 13
Hardware Installation, Package Contents, Protecting against Electrostatic Discharge - manual
View all Netgear M4100-12GF manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
2. Hardware Installation 2 This chapter explains how to install the hardware for the managed switches. Package Contents Each switch is packed and shipped separately. The package contains the following items: • Managed stackable switch with preinstalled software • Power cord • Rubber footpads for tabletop installation • Rubber caps for the SFP sockets • Rack-mounting kit • Wall-mounting kit (M4100-D10-POE, M4100-D12G, and M4100-D12G-POE+ only) • Magnetic mounting kit (M4100-D10-POE and M4100-D12G only) • USB console cable with one mini B connector and one type A connector • Resource CD: The CD includes either these documents or links to access them: - ProSafe Managed Switch Command-Line Interface (CLI) User Manual - ProSafe M4100 and M7100 Managed Switches Software Administration Manual - ProSafe M4100 Managed Switch Installation Guide - This hardware installation guide • ProSafe NMS200 Network Management System 30-day trial DVD Protecting against Electrostatic Discharge WARNING! Static electricity can harm delicate components inside your system. To prevent static damage, discharge static electricity from your body before you touch any of the electronic components, such as the microprocessor. You can do so by periodically touching an unpainted metal surface on the switch. 13