Netgear M4100-D12G Hardware Installation Guide - Page 19
Install the M4100-D12G or M4100-D10-PoE Using Magnets, See the following
View all Netgear M4100-D12G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
NETGEAR Managed Switch Install the M4100-D12G or M4100-D10-PoE Using Magnets If you use the magnets (included) to install the M4100-D12G or M4100-D10-PoE switch to a vertical metal surface, the maximum height above the floor is 75 centimeters (29.5 inches). Be sure to orient the switch as shown in the following figure. Exhaust air should come out the side of the switch case. 1. Attach the magnets to the switch using a No. 1 Phillips screwdriver and 4 screws (provided). See the following figure. 2. Press each of the 4 rubber feet firmly into the indentations on the bottom of the switch. 3. Position the switch so that it is no more than 75 centimeters (29.5 inches) above the floor. Hardware Installation 19
Hardware Installation
19
NETGEAR Managed Switch
Install the M4100-D12G or M4100-D10-PoE Using Magnets
If you use the magnets (included) to install the M4100-D12G or M4100-D10-PoE switch
to a vertical metal surface, the maximum height above the floor is 75 centimeters (29.5
inches). Be sure to orient the switch as shown in the following figure. Exhaust air should
come out the side of the switch case.
1.
Attach the magnets to the switch using a No. 1 Phillips screwdriver and 4 screws
(provided).
See the following figure.
2.
Press each of the 4 rubber feet firmly into the indentations on the bottom of the switch.
3.
Position the switch so that it is no more than 75 centimeters (29.5 inches) above the floor.