Netgear M5300-52G3 Hardware Installation Guide - Page 11
Unpacking the Hardware, Installation, Select a, Location, Package Contents, Select a Location
View all Netgear M5300-52G3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
NETGEAR Managed Stackable Switch M5300 Series You can also take the following steps to prevent damage from electrostatic discharge (ESD): 1. When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity from your body. 2. Before moving a sensitive component, place it in an antistatic container or package. 3. Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench pads, and an antistatic grounding strap. Unpacking the Hardware Check the contents of the boxes to make sure that all items are present before installing the switch. 1. Place the container on a clean flat surface, and cut all straps securing the container. 2. Unpack the hardware from the boxes. Carefully remove the hardware, and place it on a secure and clean surface. See Select a Location on page 12 3. Remove all packing material. 4. Make sure that all items are present. See Package Contents on page 10 Note: If any item is missing or damaged, contact your local NETGEAR reseller for replacement. 5. Inspect the products and accessories for damage. Report any damage immediately. Installation Install the equipment in the sequence presented in this section: 1. Select a location. See Select a Location on page 12 2. Install the switch. See Install the Switch on page 13 3. Check the installation. See Check the Installation on page 14 4. Apply power and check the LEDs. See Connect to Power and Check the LEDs on page 14 Note: This equipment is intended to be installed and used in a location other than home, school, or a public area accessible to the general population. Hardware Installation 11