Netgear XSM4324FS How to Stack NETGEAR M4300 Switches - Page 7

Step 3: Reload reboot the first switch

Page 7 highlights

Step 3: Reload (reboot) the first switch Step 4: While the first switch is booting, connect the stacking cables (in this case copper CAT-6A cables) Step 5: While the first switch is still booting, reload (reboot) the second switch Step 6: Check the stack, after second switch has started NETGEAR, the NETGEAR logo and ProSAFE are trademarks and/or registered trademarks of NETGEAR, Inc. and/or its subsidiaries in the United States and/or other countries. SDVoE is a trademark of the SDVoE Alliance. Information iPsasgubeje7ct to change without notice. ©2018 NETGEAR, Inc. All rights reserved.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Step 3: Reload (reboot) the first switch
Step 4: While the first switch is booting, connect the stacking cables (in this case copper CAT-6A cables)
Step 5: While the first switch is still booting, reload (reboot) the second switch
Step 6: Check the stack, after second switch has started
NETGEAR, the NETGEAR logo and ProSAFE are trademarks and/or registered trademarks of NETGEAR, Inc. and/or its subsidiaries in the United States and/or
other countries. SDVoE is a trademark of the SDVoE Alliance.
Information is subject to change without notice. ©2018 NETGEAR, Inc. All rights reserved.