Panasonic 19 Touchscreen PC version Service Manual - Page 45
Setting the Pad PCB and SW PCB
UPC - 092281896069
View all Panasonic 19 Touchscreen PC version manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 45 highlights
9.2.7. Setting the Pad PCB and SW PCB 1. Attach both the SW PCB and the Operation Sheet to the Cabinet. SW PCB 2. Connect the 3 Cables to the 3 Connectors. (CN800,CN805,CN807) 3. Fix the Pad PCB using the 4 Screws. Note: Tighten the Screws in the numbered order (No1 to No4). Screws : DFHE5025XA Operation Sheet :No.3 :No.2 :No.1 Connector(CN807) Pad PCB :No.4 Connector(CN805)
9.2.7.
Setting the Pad PCB and SW PCB
1.AttachboththeSWPCBandtheOperationSheettothe
Cabinet.
2.Connectthe3Cablestothe3Connectors.
(CN800,CN805,CN807)
3.FixthePadPCBusingthe4Screws.<N1>
Note:
Tighten the Screws in the numbered order (No1 to
No4).
Screws<N1>:DFHE5025XA
SWPCB
OperationSheet
<N1>:No.3
PadPCB
Connector(CN807)
Connector(CN805)
<N1>:No.2
<N1>:No.1
<N1>:No.4
45 / 90