Panasonic NC-EH40 Operating Instructions - Page 14
Main unit, Mesh filter, Power cord
View all Panasonic NC-EH40 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Part Names and Handling Instructions Part Names and Handling Instructions Operation panel If the protective film is still covering the surface of the operation panel, peel it off before using the operation panel. Lid opening lever Steam vent Lid Dispensing spout Window rim Handle Main unit Container Minimum water level mark Mesh filter (Replaceable part) It may have come off from the bottom of the container. Push it completely into the correct position. (See P.20) Rotating base (360 degrees) When rotating the pot, do not allow the cord to wind around the unit. Power cord Power plug* Cord Body plug *The shape of plug differs according to region. 14 Operating NC-EH40_EN.indd 14 11/7/07 3:57:13 PM
14
Part Names and Handling Instructions
Part Names and Handling Instructions
Operation panel
If the protective film is still covering the surface of the operation panel,
peel it off before using the operation panel.
Lid opening lever
Steam vent
Lid
Main unit
Handle
Container
Minimum water
level mark
Dispensing
spout
Window rim
Mesh filter
Rotating base (360 degrees)
When rotating the pot, do not allow
the cord to wind around the unit.
Power cord
Power plug*
Cord
Body plug
*The shape of plug differs according to region.
(Replaceable part)
It may have come off from the bottom of the con-
tainer. Push it completely into the correct position.
(See P.20)
Operating NC-EH40_EN.indd
14
11/7/07
3:57:13 PM