Pfaff hobbylock 786 Owner's Manual - Page 9

respective - how to fix

Page 9 highlights

I n E1 H Opening and closing looper cover and work support Push looper cover fully to the right. hold it, and swing it down. To close the looper cover, push it up until it locks. To open work support 12, push it to the left. To close the work support, push it to the right until it locks. A threacing diagram is fixed to the machine behind the looper cover. This diagram shows the different threading paths by different colors (see Fig. A). 1 Threading the guide wire of the thread spool stand and the thread guides behind the carrying handle The machine must be threaded correctly. First pull the respective threads through their corresponding guides (Figs. B and C). Then thread the tensions in the following sequence: 1. right looper (red) 2. left looper (yellow) 3. right needle (green) 4. left needle (blue) C Figure B shows the threading path of the individual threads for thread guides 18. For threading the guides oehind carrying handle 2, the handle must be pulled up (Fig. C). After threading, carrying handle 2 must be pushed down again. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

I
n
E1
H
Opening
and
closing
looper
cover
and
work
support
Push
looper
cover
fully
to
the
right.
hold
it,
and
swing
it
down.
To
close
the
looper
cover,
push
it
up
until
it
locks.
To
open
work
support
12,
push
it
to
the
left.
To
close
the
work
support,
push
it
to
the
right
until
it
locks.
A
threacing
diagram
is
fixed
to
the
machine
behind
the
looper
cover.
This
diagram
shows
the
different
threading
paths
by
different
colors
(see
Fig.
A).
C
Threading
the
guide
wire
of
the
thread
spool
stand
and
the
thread
guides
behind
the
carrying
handle
The
machine
must
be
threaded
correctly.
First
pull
the
respective
threads
through
their
corresponding
guides
(Figs.
B
and
C).
Then
thread
the
tensions
in
the
following
sequence:
1.
right
looper
(red)
2.
left
looper
(yellow)
3.
right
needle
(green)
4.
left
needle
(blue)
Figure
B
shows
the
threading
path
of
the
individual
threads
for
thread
guides
18.
For
threading
the
guides
oehind
carrying
handle
2,
the
handle
must
be
pulled
up
(Fig.
C).
After
threading,
carrying
handle
2
must
be
pushed
down
again.
1
7