Poulan PPB40AB Owner Manual - Page 8

Assembly

Page 8 highlights

ASSEMBLY PACKING LIST • 40V Blower • Blower Tube • 40V 2Ah Battery (PPB402AH) • 40V Charger (PPB40CGR) • Owner's Manual If any parts are damaged or missing, please call 1-855-378-6903. BLOWER TUBE ASSEMBLY WARNING: To prevent accidental starting that could cause serious personal injury, always remove the battery pack from the tool when assembling parts. BATTERY REMOVAL • Press in and hold the latch button with firm grip. • Grasp the trigger handle firmly. Pull the battery pack out of the handle. BATTERY INSTALLATION • Align the tongue of the battery pack with the cavity in the handle housing. • Grasp the trigger handle firmly. • Push the battery pack into the handle until both sides lock. The latch button will click when locked into place. • Do not use force when inserting the battery pack. It should slide into place and click. Groove Tube Tab 1. Align either of the grooves in the tube with the tabs on the blower housing. Push the tube onto the blower housing until the tab engages the grooves. Battery release button Unlock Lock 比例 25. 400 NOTE: The battery pack fits snugly into the handle to prevent accidental dislodging. It may require a strong pull to remove. IMPORTANT: The battery is not shipped fully charged. It is recommended that the battery be fully charged before initial use. With regular use, the battery pack will take 1 hour or less to fully charge. It is recommended that the battery be charged every 3 months when the blower is not in use. The battery's run time will improve after the third or fourth charge. Lock position 2. Turn the tube in the direction of the arrow until both of the tabs slide into the lock positions. 比例 25.400 3. Twist the separate two parts of the blower tube clockwise until the tube locks into position. 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43

8
ASSEMBLY
PACKING LIST
40V Blower
Blower Tube
40V 2Ah Battery (PPB402AH)
40V Charger (PPB40CGR)
Owner's Manual
If any parts are damaged or missing, please
call 1-855-378-6903.
BATTERY REMOVAL
Press in and hold the latch button with firm
grip.
Grasp the trigger handle firmly. Pull the
battery pack out of the handle.
BATTERY INSTALLATION
Align the tongue of the battery pack with
the cavity in the handle housing.
Grasp the trigger handle firmly.
Push the battery pack into the handle until
both sides lock. The latch button will click
when locked into place.
Do not use force when inserting the battery
pack. It should slide into place and click.
NOTE:
The battery pack fits snugly into the
handle to prevent accidental dislodging. It
may require a strong pull to remove.
IMPORTANT:
The battery is not shipped fully
charged. It is recommended that the battery be
fully charged before initial use. With regular
use, the battery pack will take 1 hour or less
to fully charge. It is recommended that the
battery be charged every 3 months when the
blower is not in use. The battery's run time will
improve after the third or fourth charge.
BLOWER TUBE ASSEMBLY
WARNING:
To prevent accidental
starting that could cause serious personal
injury, always remove the battery pack from
the tool when assembling parts.
1. Align either of the grooves in the tube with
the tabs on the blower housing. Push the tube
onto the blower housing until the tab engages
the grooves.
2. Turn the tube in the direction of the arrow
until both of the tabs slide into the lock
positions.
3. Twist the separate two parts of the blower
tube clockwise until the tube locks into
position.
Battery release button
Lock
Unlock
Lock position
Tube
Groove
Tab