ProForm 280 Csx Bike English Manual - Page 6

Carefully pull the excess Upper Wire Harness

Page 6 highlights

2. While another person lifts the rear of the Frame (1), attach the Rear Stabilizer (6) with two M10 2 x 75mm Carriage Bolts (30) and two M10 Locknuts (33). 33 1 33 6 30 3. While a second person holds the Upright (13) near the Frame (1), connect the Upper Wire 3 Harness (36) to the Lower Wire Harness (55). Carefully pull the excess Upper Wire Harness (36) out of the top of the Upright (13), and slide the Upright onto the Frame (1). Tip: Avoid pinching the wires. Attach the Upright (13) with three M8 x 25mm Patch Screws (45) and three M8 Split Washers (41). Avoid pinching the wires 13 41 45 41 36 45 55 1 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

6
2.
While another person lifts the rear of the Frame
(1), attach the Rear Stabilizer (6) with two M10
x 75mm Carriage Bolts (30) and two M10
Locknuts (33).
30
6
1
33
33
2
3
55
41
41
45
45
1
13
36
3.
While a second person holds the Upright (13)
near the Frame (1), connect the Upper Wire
Harness (36) to the Lower Wire Harness (55).
Carefully pull the excess Upper Wire Harness
(36) out of the top of the Upright (13), and slide
the Upright onto the Frame (1).
Tip: Avoid pinching the wires.
Attach the
Upright (13) with three M8 x 25mm Patch
Screws (45) and three M8 Split Washers (41).
Avoid pinching
the wires