Pyle SLDPS Instruction Manual - Page 6

Pole A, Pole B, Inner Pole Hole, Ceiling

Page 6 highlights

4 Pole A Pole B Install the pole A on the pole B as shown above. Fasten the connection with the iron rod 5 Install the top dome on the top of pole A as shown above. Rotate the top of pole A anticlockwise until the hole of the inner pole shows up. Inner Pole Hole 6 Use an iron rod to rotate the inner pole anti-clockwise until the upper base could not go up further against the ceiling. Please make sure that the pole is vertical between the ground and the ceiling and that the upper base is at against the ceiling as shown in the pictures below. 6 www.SereneLifeHome.com Ceiling

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

www.SereneLifeHome.com
6
Install the pole A on the pole B as shown above. Fasten the connection with the
iron rod
4
Pole A
Pole B
Inner Pole Hole
Ceiling
5
6
Install the top dome on the top of
pole A as shown above. Rotate the
top of pole A anticlockwise until the
hole of the inner pole shows up.
Use an iron rod to rotate the inner
pole anti-clockwise until the upper
base could not go up further
against the ceiling. Please make
sure that the pole is vertical
between the ground and the
ceiling and that the upper base is
flat against the ceiling as shown in
the pictures below.