Smeg SC712U Instruction Manual - Page 6
Instructions for the Installer
View all Smeg SC712U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Instructions for the Installer U.S. INSTALLATION ONLY - 3-WIRE GROUNDED JUNCTION BOX Refer to picture 1, where local codes allow the connection of the oven frame grounding conductor to the power supply cable neutral wire (white wire): - The ground wire must be connected first; - If local codes permit, connect the green or yellow-green ground wire from the appliance and the white wire from the appliance to the supply cable neutral wire (white wire). - Connect the red and black wires of the appliance cable to the matching power supply cables in the junction box. UL/CSA listed wire connector pic.1) U.S. INSTALLATION AND CANADIAN INSTALLATION - 4-WIRE GROUNDED JUNCTION BOX Refer to picture 2, - Separate the green or yellow-green wires from the white wires that extend out of the end of the appliance cable. - The ground wire must be connected first; - Connect the green or yellow-green ground wire from the appliance to the grounded lead in the junction box (green wire). Do not connect the frame grounding wire to the neutral wire in the junction box. UL/CSA listed wire connector - Connect the red and black wires of the appliance cable to the matching color wires in the junction box. pic.2) - Connect the white wire from the appliance cable to the neutral (white) wire in the junction box. Connect to a 20A fuse or circuit breaker. Connect to copper wire, or, if connection is made to aluminum house wiring, use UL-listed or CSA-approved connectors that are approved for joining aluminum and copper wires. 8