Sub-Zero 736TFI Integrated Installation Guide - Page 13

Integrated Installation, Molding Installation, Water Line Connection

Page 13 highlights

Integrated Installation 13 subzero.com/specs Molding Installation Install the decorative white molding strips to the top and sides of the integrated unit for a finished look. The top molding strip, used on column and tall models, must be installed before the side molding can be attached. The top molding strip is held in place by double-sided velcro. The side molding strips snap into place over brackets attached to the side of the unit. Refer to the illustrations below for positioning. For installations where units are side by side, refer to dual installations on page 20. If you choose, the molding strips may be painted to match surrounding cabinetry. Follow these steps: Rough up the surface to be painted with fine grit sandpaper. Wipe with alcohol to ensure that the surface is clean and dry. Use an appliance or industrial grade, oil base, high gloss enamel paint. TOP MOLDING SIDE MOLDING Water Line Connection QUICK CONNECT WATER VALVE For units with an ice maker, the quick connect water valve and PEX tubing are located on the bottom right side of the unit. To connect the ice maker water line, attach the union fitting to the house water supply line. Pull the coiled gray PEX tubing with red cap and captured nut toward the house water supply line. Remove and discard the red cap. Then attach the tubing to the union with the nut. Tighten all connections. Recoil the excess tubing under the unit. Refer to the illustration below. Turn on the water supply and check all fittings for leaks. Make sure the electrical harness is attached to the solenoid. An in-line filter is required when water conditions have a high sediment content. The ice maker will not fill with water immediately. Allow 24 hours for proper ice production. The first container of ice should be discarded. As with any new connection, there may be impurities in the ice from the water supply line. IMPORTANT NOTE: Water lines must not be exposed to freezing temperatures. Exposure could cause damage to the unit and home. Top molding. Side molding. PEX TUBING Water line connection.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

Integrated Installation
13
subzero.com/specs
Molding Installation
Install the decorative white molding strips to the top and
sides of the integrated unit for a finished look. The top
molding strip, used on column and tall models, must be
installed before the side molding can be attached. The top
molding strip is held in place by double-sided velcro. The
side molding strips snap into place over brackets attached
to the side of the unit. Refer to the illustrations below for
positioning. For installations where units are side by side,
refer to dual installations on page 20.
If you choose, the molding strips may be painted to match
surrounding cabinetry. Follow these steps: Rough up the
surface to be painted with fine grit sandpaper. Wipe with
alcohol to ensure that the surface is clean and dry. Use an
appliance or industrial grade, oil base, high gloss enamel
paint.
TOP
MOLDING
Top molding.
Side molding.
SIDE
MOLDING
Water Line Connection
QUICK CONNECT WATER VALVE
For units with an ice maker, the quick connect water valve
and PEX tubing are located on the bottom right side of the
unit.
To connect the ice maker water line, attach the union
fitting to the house water supply line. Pull the coiled gray
PEX tubing with red cap and captured nut toward the
house water supply line. Remove and discard the red cap.
Then attach the tubing to the union with the nut. Tighten
all connections. Recoil the excess tubing under the unit.
Refer to the illustration below.
Turn on the water supply and check all fittings for leaks.
Make sure the electrical harness is attached to the
solenoid.
An in-line filter is required when water conditions have
a high sediment content.
The ice maker will not fill with water immediately. Allow 24
hours for proper ice production. The first container of ice
should be discarded. As with any new connection, there
may be impurities in the ice from the water supply line.
IMPORTANT NOTE:
Water lines must not be exposed to
freezing temperatures. Exposure could cause damage to
the unit and home.
PEX
TUBING
Water line connection.