Sub-Zero UC-24C Undercounter Installation Guide - Page 5
Site Preparation, Before You Start - uc 24ci
View all Sub-Zero UC-24C manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Site Preparation 5 subzero.com/specs Before You Start Make sure the opening dimensions, door clearance, electrical service and plumbing are correct for the model you are about to install. Refer to specifications on the following pages. IMPORTANT NOTE: To operate properly, the door must open a minimum of 90°. Use a minimum 3" (76) filler in corner installations to assure a 90° door opening. Allow enough clearance in front of the unit for full door swing. TOOLS AND MATERIALS REQUIRED • Appliance dolly able to support 130 lbs (59 kg) • Level - 2' (.6 m) and 4' (1.2 m) recommended • Phillips and slotted screwdriver sets • Wrench set and allen wrench set • Crescent wrenches • Various sized pliers • 5/16" hex bolt nut driver • Drill and assorted drill bits • Model UC-24CI-4' (1.2 m) of 1/4" copper, braided stainless steel or PEX tubing and saddle valve for water line (do not use self-piercing valves). • Model UC-24CI-Tubing cutter. • Masonite, plywood, 1/8" pressed fiberboard, cardboard or other suitable material to protect finished flooring