Viking VCFB364LSS Installation Instructions - Page 31
Performance Checklist
View all Viking VCFB364LSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
25 26 Open door. Display should flash. Press "ACTIVATE CONTROLS" button pad and close door. Note: There is a 6 minute delay before the unit starts. Performance Checklist h Verify cabinet size. h Verify electrical supply and water supply (if applicable). h Install anti-tip device(s) and verify unit is secure. h Position unit in cutout, level at desired height, and secure unit. h Plug-in unit and verify operation. h Connect water supply (if applicable). • Verify icemaker fill tube is properly inserted. • Verify icemaker bailarm is down. • Verify dispenser operation (if applicable). h Align/square door(s). h Verify drain pan is properly installed and there are no leaks in water connection. h Install kickplate. h Remove internal packaging and labels and wipe unit down. Installer's information: Installer's name Installer's company Date 60 61