Viking VCWB300RSS Installation Instructions - Page 14
Kickplate Installation, Door Stop Adjustment, Hinge Adjustment - parts
View all Viking VCWB300RSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
KICKPLATE INSTALLATION The kickplate consists of a two (2) part assembly: one top louvered panel and one bottom solid panel. Install the kickplate with louvered section on the top. Flooring must allow the kickplate to be removed. See "Site Preparations" for height clearance (pages 5 and 6). To install: 1. Insert the bottom (solid) panel into the open end of the top (louvered) panel. The holes in the bottom panel should line up with the slots in the top panel. 2. Position the kickplate assembly along the front edge of the wine cellar. 3. Align the holes on both ends of the top (louvered ) panel with the holes in the base of the wine cellar. 4. Attach the kickplate to the wine cellar on each side with the two black phillips head screws provided. 5. Adjust the bottom (solid) panel to the desired height and fasten in place by tightening the screws in the slots. There is approximately 1" (2.5 cm) of vertical adjustment on the kickplate. Screws and slots for adjustments DOOR STOP ADJUSTMENT 1. Using a 3/16" allen wrench, remove door stop pin located in bottom hinge. 2. The pin is factory set 110°. For 120° swing, move the pin to the utmost forward stop hole. For 90° swing, move the pin to the utmost rear stop hole. HINGE ADJUSTMENT 1. Using a 3/16" allen wrench, remove the door stop pin located in bottom hinge. 2. Using the height adjustment shim as a wrenching device, rotate the height adjustment bushing counterclockwise to raise or clockwise to lower the location of the door. 3. When proper adjustment is reached, align shim with door stop pin holes and replace door stop pin. Firmly tighten pin in place. Attach to unit with these screws 90° door stop 120° door stop 26 27