Viking VUBV Installation Instructions - Page 7

Leveling Information, Installation Tip

Page 7 highlights

Installation LEVELING INFORMATION 1. Use a level to confirm the unit is level. Level should be placed along top edge and side edge as shown. 1 1. Plug in the power/electrical cord. 2. Gently push the unit into position. Be careful not to entangle the cord or water and drain lines, if applicable. 3. Re-check the leveling, from front to back and side to side. Make any necessary adjustments. The unit's top surface should be approximately 1⁄8" (3 mm) below the countertop. 4. Install the anti-tip bracket. 5. Remove interior packing material and wipe out the inside of the unit with a clean, water-dampened cloth. 2. If the unit is not level, adjust the legs on the corners of the unit as necessary. Turn to Adjust 3. Confirm the unit is level after each adjustment and repeat the previous steps as needed. INSTALLATION TIP If the room floor is higher than the floor in the cutout opening, adjust the rear legs to achieve a total unit rear height of 1⁄8" (3 mm) less than opening's rear height. Shorten the unit height in the front by adjusting the front legs. This allows the unit to be gently tipped into the opening. Readjust the front legs to level the unit after it is correctly positioned in the opening. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72

7
LEVELING INFORMATION
1.
Use a level to confirm
the unit is level. Level
should be placed
along top edge and
side edge as shown.
2.
If the unit is not level, adjust the legs on the corners of
the unit as necessary.
3.
Confirm the unit is level after each adjustment and
repeat the previous steps as needed.
INSTALLATION TIP
If the room floor is higher than the floor in the cutout
opening, adjust the rear legs to achieve a total unit rear
height of ³⁄±” (3 mm) less than opening’s rear height. Shorten
the unit height in the front by adjusting the front legs. This
allows the unit to be gently tipped into the opening. Readjust
the front legs to level the unit after it is correctly positioned
in the opening.
1.
Plug in the power/electrical cord.
2.
Gently push the unit into position. Be careful not to
entangle the cord or water and drain lines, if applicable.
3.
Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit’s top
surface should be approximately ³⁄±” (3 mm) below the
countertop.
4.
Install the anti-tip bracket.
².
Remove interior packing material and wipe out the
inside of the unit with a clean, water-dampened cloth.
1
Turn to Adjust
Installation