Weider Pro 3550 English Manual - Page 11
Cable Assembly
View all Weider Pro 3550 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
16. Lubricate a 3/8" x 3" Button Head Bolt (104) and both sides of two Plastic Washers (56) with grease. Attach the Right Butterfly Arm (26) to the Butterfly Frame (47) with the Bolt, the two Plastic Washers, two Butterfly Caps (57), two 3/8" Washers (91), and a 3/8" Nylon Jamnut (113) as shown. Make sure that the recessed sides of the Plastic Washers are fitted over the welded bushing in the Butterfly Arm. Do not overtighten the Nylon Jamnut; the Butterfly Arm must be able to pivot easily. Repeat this step with the Left Butterfly Arm (25). 16 26 56 104 91 57 57 91 113 47 25 17. Wet the Left VKR Arm (30) with soapy water. Slide 17 a Short Pad (20) onto the VKR Arm. Attach a VKR Handle (66) to the VKR Arm with a 3/8" Washer (91) and a 3/8" Nylon Jamnut (113). Slide an Inner Cap w/Hole (111) onto the end of the VKR Arm. 36 111 31 36 Wet the VKR Handle (66) and the handle welded to the Left VKR Arm (30) with soapy water. Slide 5" Handgrips (36) onto both handles. 66 Repeat this step with the Right VKR Arm (31). 20 91 113 30 18. Attach the Left and Right VKR Arms (30, 31) to the 18 VKR Upright (5) with two 3/8" x 2 3/4" Bolts (101) and two 3/8" Nylon Jamnuts (113). 31 CABLE ASSEMBLY 19. IMPORTANT: Refer to the Cable Identification Chart on page 26 for help identifying the 19 cables. Do not overtighten the bolts and nuts attaching the pulleys. The pulleys must be able to turn freely. Locate and open the parts bags labeled "CABLE ASSEMBLY" and "PULLEYS." Locate the VKR High Cable (74), which is 82 1/4" long and has an eyelet on one end and a threaded bolt on the other end. Attach the eyelet end of the Cable inside of the Top Frame (6) with a 5/16" x 2 1/2" Bolt (59), two 5/16" Washers (90), and a 5/16" Nylon Locknut (86). 11 101 30 86 113 5 90 59 6 74