Acer Aspire 7560 Aspire 7560, 7560G Service Guide - Page 123

Power Board Installation, Sleep Sensor Board, Power Board Screws

Page 123 highlights

3. Remove sleep sensor board (C) from upper cover guides (D). (Figure 3-42) D C D Figure 3-42. Sleep Sensor Board 4. Remove screws (E) from power board. (Figure 3-43) E Figure 3-43. Power Board Screws 5. Remove power board and sleep sensor board from upper cover. Power Board Installation 0 1. Install power board on upper cover. (Figure 3-43) 2. Install and secure screws (E) to power board. 3. Align and install sleep sensor board (C) in upper cover guides (D). (Figure 3-42) 4. Install tape (B) securing sleep sensor board to upper cover. (Figure 3-41) ID E Size M2.5x3.0 Ni Quantity 2 Screw Type Machine Maintenance Procedures 3-35

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.