Asus ROG MAXIMUS Z790 FORMULA Users Manual English - Page 48

Remove the plastic film from the thermal pads on the bottom of the heatsinks., Replace the heatsinks.

Page 48 highlights

E. Install your M.2 module to the M.2 slot. Ensure that there is nothing obstructing your M.2 module when installing the M.2 module to the M.2 slot. F. Rotate the M.2 Q-Latch clockwise to secure the M.2 module in place. 4. Remove the plastic film from the thermal pads on the bottom of the heatsinks. If the thermal pad on the M.2 heatsink becomes damaged, we recommend replacing it with the bundled thermal pad or a thermal pad with a thickness of 1.25mm. 5. Replace the heatsinks. 6. Secure the heatsinks using the screws on the heatsinks. M.2 heatsink for M.2_1(SOCKET3) 6 6 5 4 Chapter 2 2-10 Chapter 2: Basic Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76

2-10
Chapter 2: Basic Installation
Chapter 2
E.
Install your M.2 module to the M.2 slot.
Ensure that there is nothing obstructing your M.2 module when installing the M.2 module
to the M.2 slot.
F.
Rotate the M.2 Q-Latch clockwise to secure the M.2 module in place.
4.
Remove the plastic film from the thermal pads on the bottom of the heatsinks.
If the thermal pad on the M.2 heatsink becomes damaged, we recommend replacing it
with the bundled thermal pad or a thermal pad with a thickness of 1.25mm.
5.
Replace the heatsinks.
6.
Secure the heatsinks using the screws on the heatsinks.
5
6
6
4
M.2 heatsink for M.2_1(SOCKET3)