Initial Preparations, Guidelines

Page 9 highlights

INITIAL PREPARATIONS • Determine the operating voltage at the installation site. The camera's Voltage Regulator Board accepts both 12-24VDC/VAC input without change to internal connections. See Section 2, Input Power Connections. • Determine the optimum location for the camera. See Section 3, Mounting Specification. • All cameras have been tested prior to shipment. After the wiring has been reconnected, it is advisable to check the camera's operation before installation. GUIDELINES The installation of the REG-D1 camera is explained in Sections 1 to 3. It is important that these steps are followed and to practice proper installation procedures with proper safety equipment. - 3 -

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

- 3 -
INITIAL PREPARATIONS
Determine the operating voltage at the
installation site. The camera‘s Voltage Regulator
Board accepts both 12-24VDC/VAC input
without change to internal connections.
See
Section 2, Input Power Connections
.
Determine the optimum location for the camera.
See
Section 3, Mounting Specification.
All cameras have been tested prior to shipment.
After the wiring has been reconnected, it is
advisable to check the camera’s operation
before installation.
GUIDELINES
The installation of the
REG-D1
camera is explained in
Sections 1 to 3.
It is important that these steps are followed and to
practice proper installation procedures with proper safety
equipment.