Bosch SHXM63W55N Instructions for Use - Page 19

Removing/Installing third

Page 19 highlights

Removing/Installing third rack Loading the Dishwasher en-us Installing third rack 1* 1. Pull out third rack rails all the way (1). 2. Insert third rack at an angle. Make sure that the stopper hooks of both rails slide in between the holding hooks and the lower rollers of the third rack (2). 3. Slide third rack in and lift the upper rollers over the front stopper hooks of both rails (3). 4. Push in third rack (4).   Removing third rack 1* 1. Pull out third rack all the way (1).  2. Lift upper rollers over the stopper hooks of both rails (2). 3. Pull third rack out forward and upward so the the holding hooks and the lower rollers of the rack  slide over the stopper hooks of both rails (3).    19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

Loading the Dishwasher
en-us
19
Removing/Installing third
rack
Removing third rack
1*
1.
Pull out third rack all the way (1).
2.
Lift upper rollers over the stopper
hooks of both rails (2).
3.
Pull third rack out forward and
upward so the the holding hooks
and the lower rollers of the rack
slide over the stopper hooks of
both rails (3).
Installing third rack
1*
1.
Pull out third rack rails all the
way (1).
2.
Insert third rack at an angle. Make
sure that the stopper hooks of
both rails slide in between the
holding hooks and the lower
rollers of the third rack (2).
3.
Slide third rack in and lift the
upper rollers over the front
stopper hooks of both rails (3).
4.
Push in third rack (4).