Brother International Innov-is VQ3000 Operation Manual - Page 192
Install the needle plate cover and bobbin, cover with tabs., Install the flat bed attachment.
View all Brother International Innov-is VQ3000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 192 highlights
PREPARING FOR BOBBIN WORK p Install the needle cover with tabs. plate cover and bobbin For details on installing the needle plate cover, refer to "Cleaning the Race" on page A-15. a Bobbin cover b Bobbin cover with tabs CAUTION • When creating bobbin work, use the bobbin cover with tabs, otherwise the thread may become tangled or the needle may break. Note • When installing the needle plate cover, do not allow it to pinch the thread. q Install the flat bed attachment. Note • When installing the flat bed attachment, do not allow it to pinch the thread. • When the bobbin thread is replaced with a new one, be sure to repeat the procedure from a, otherwise the lower threading will not be done correctly. This completes the upper and lower threading. A-8