D-Link DES-3224 Product Manual - Page 16

Installing the DES-3224

Page 16 highlights

10/100 Auto Negotiation Switch User's Guide 2 Installing the DES-3224 This chapter covers the following: • Unpacking the DES-3224 • Installation options and instructions • Powering on the DES-3224 Unpacking the DES-3224 Open the box and carefully unpack the DES-3224. You should have all the items on the following checklist: • DES-3224 10/100 Auto Negotiation Switch • RS-232 DCE serial cable • Two mounting brackets and eight screws • Four rubber pads with adhesive backing • One six foot (1.82 m) power cord • DES-3216/3224 User's Guide CD ROM If any items are missing, contact the retailer where you purchased the DES-3224 for assistance. Be sure to register the DES-3224 immediately. Failure to register the DES-3224 may void the warranty. Installation Options There are two options for installing the DES-3224: desktop/ shelf installation or rack installation. Follow these guidelines for desktop/ shelf installation or rack installation: • The surface must support 18 lbs or 8 kg. • The power source must be within six feet (1.82 m) • Power cord and cables should never be stretched • Leave at least two inches around the DES-3224 for ventilation The following tools and materials may be necessary to install the DES-3224: • Screwdriver to install the brackets as needed • Wire cutters to cut cable as needed for network connections • Crimpers to crimp cable as needed • RJ-45 connectors as needed Installing the DES-3224 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75

10/100 Auto Negotiation Switch User’s Guide
Installing the DES-3224
6
2
Installing the DES-3224
This chapter covers the following:
Unpacking the DES-3224
Installation options and instructions
Powering on the DES-3224
Unpacking the DES-3224
Open the box and carefully unpack the DES-3224. You should have all the items on the
following checklist:
DES-3224 10/100 Auto Negotiation Switch
RS-232 DCE serial cable
Two mounting brackets and eight screws
Four rubber pads with adhesive backing
One six foot (1.82 m) power cord
DES-3216/3224 User’s Guide CD ROM
If any items are missing, contact the retailer where you purchased the DES-3224 for
assistance.
Be sure to register the DES-3224 immediately. Failure to register the DES-3224 may void
the warranty.
Installation Options
There are two options for installing the DES-3224: desktop/ shelf installation or rack
installation.
Follow these guidelines for desktop/ shelf installation or rack installation:
The surface must support 18 lbs or 8 kg.
The power source must be within six feet (1.82 m)
Power cord and cables should never be stretched
Leave at least two inches around the DES-3224 for ventilation
The following tools and materials may be necessary to install the DES-3224:
Screwdriver to install the brackets as needed
Wire cutters to cut cable as needed for network connections
Crimpers to crimp cable as needed
RJ-45 connectors as needed