Dell Force10 S5000 Installation Guide - Page 5
About this Guide, Related Publications - manual
View all Dell Force10 S5000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
1 About this Guide This guide provides site preparation recommendations, and step-by-step procedures for rack mounting, installing and replacing pluggable modules, and connecting to a power source. After you have completed the hardware installation and power-up of the S5000, for software configuration information, refer to the FTOS Configuration Guide for the S5000 Switch and for Command Line Interface (CLI) information, refer to the FTOS Command Line Reference Guide for the S5000 Switch. CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment. WARNING: Only trained and qualified personnel can install this equipment. Read this guide before you install and power up this equipment. This equipment contains two power cords. Disconnect both power cords before servicing. WARNING: This equipment contains optical transceivers, which comply with the limits of Class 1 laser radiation. WARNING: When no cable is connected, visible and invisible laser radiation may be emitted from the aperture of the optical transceiver ports. Avoid exposure to laser radiation and do not stare into open apertures. Related Publications For more information about the S5000, refer to the following documents: • FTOS Configuration Guide for the S5000 Switch • FTOS Command Line Reference Guide for the S5000 Switch • FTOS Release Notes for the S5000 Switch NOTE: For the most recent documentation and software, visit iSupport (registration for access to some sections is required): http://www.dell.com/support/manuals. 5