Dell PowerStore 3000X EMC PowerStore Network Configuration Guide for PowerSwit - Page 35

Cable the base enclosure to the ToR switches, Cable the ToR switches together

Page 35 highlights

Cable the base enclosure to the ToR switches Cable the nodes to the Top of Rack (ToR) switches. 2 1 4 3 Figure 14. Base enclosure connection to the ToR switches As demonstrated in the diagram, when cabling the nodes to the ToR switches: ● Port 0 and Port 1 on the same node must connect to opposite switches ● Port 0 on Node A, and Port 0 on Node B must connect to opposite switches ● Port 1 on Node A, and Port 1 on Node B must connect to opposite switches Table 10. Steps to cable to the switches 1 Connect Port 0 of the bottom node (A) to Port 1 of the bottom switch (1). 2 Connect Port 1 of the bottom node (A) to Port 1 of the top switch (2). 3 Connect Port 1 of the top node (B), to Port 54 of the bottom switch (1). 4 Connect Port 0 of the top node (B), to Port 54 of the top switch (2). Cable the ToR switches together PowerStore dual switch deployments with VLT, requires that the two Top of Rack (ToR) switches are cabled together. 1 2 Figure 15. Switch-to-switch connectivity PowerStore T model: Cabling the appliance to the switches 35

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93

Cable the base enclosure to the ToR switches
Cable the nodes to the Top of Rack (ToR) switches.
2
4
1
3
Figure 14. Base enclosure connection to the ToR switches
As demonstrated in the diagram, when cabling the nodes to the ToR switches:
Port 0 and Port 1 on the same node must connect to opposite switches
Port 0 on Node A, and Port 0 on Node B must connect to opposite switches
Port 1 on Node A, and Port 1 on Node B must connect to opposite switches
Table 10. Steps to cable to the switches
1
Connect Port 0 of the bottom node (A) to Port 1 of the bottom switch (1).
2
Connect Port 1 of the bottom node (A) to Port 1 of the top switch (2).
3
Connect Port 1 of the top node (B), to Port 54 of the bottom switch (1).
4
Connect Port 0 of the top node (B), to Port 54 of the top switch (2).
Cable the ToR switches together
PowerStore dual switch deployments with VLT, requires that the two Top of Rack (ToR) switches are cabled together.
2
1
Figure 15. Switch-to-switch connectivity
PowerStore T model: Cabling the appliance to the switches
35