Fisher and Paykel CDV3-304H-N Installation Guide - Page 14
Final Checklist, To Be Completed By The Installer, General, Electrical
View all Fisher and Paykel CDV3-304H-N manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
FINAL CHECKLIST TO BE COMPLETED BY THE INSTALLER GENERAL Specified clearance maintained. Unit is level - front to back and side to side. All packaging materials have been removed. Dials turn correctly and freely. Burners light satisfactorily, both individually and with other burners operating. Flame adjustments made if required. GAS Connection: 1/2 NPT with a minimum 5/8" diameter flex line. Site gas supply is compatible with cooktop model, and sufficient pressure is available The pressure regulator which is connected to the manifold is set correctly Manual gas shut-off valve installed in an accessible location. Unit tested and free of gas leaks. ELECTRICAL Receptacle with correctly rated over-current protection is provided for service cord connection. Adequate ground connection. Complete and keep for safe reference: Model Serial no. Purchase date Purchaser Dealer address Installer's name Installer's signature Installation company Installation date 14