GE DCVH680GJMV Use and Care Manual - Page 21
Kit Contents, Tools You Will Need, Installation Preparation
UPC - 084691208921
View all GE DCVH680GJMV manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
Safety Instructions Operating Instructions Stacking. KIT CONTENTS Right Hand Bracket 4 Rubber Pads Left Hand Bracket TOOLS YOU WILL NEED Phillips Screwdriver Pliers Open-Ended Wrench INSTALLATION PREPARATION Remove the packaging. Flatten the product carton to use as a pad to lay the dryer down on its side. Continue using the carton to protect the finished floor in front of the installation location. 4 #12 x 1" Screws 4 #8 x 1/2" Screws Gloves Level Troubleshooting Tips Consumer Support 21
Stacking.
KIT CONTENTS
Right Hand Bracket
Left Hand Bracket
4 Rubber Pads
4 #12 x 1” Screws
4 #8 x 1/2” Screws
TOOLS YOU WILL NEED
Phillips Screwdriver
Open-Ended Wrench
Pliers
Gloves
Level
INSTALLATION PREPARATION
Remove the packaging.
Flatten the product carton to use as a pad
to lay the dryer down on its side. Continue using
the carton to protect the finished floor in front of
the installation location.
21
Operating Instructions
Safety Instructions
Consumer Support
Troubleshooting Tips