Page 5 highlights

Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING The Advantium 240V can be installed in combination with other GE/Monogram appliances. Always follow each product's Installation Instructions to complete the installation. Single Advantium 240V Installation: Order a 30" wide single oven cabinet or cut the opening in a wall to the dimensions shown. 30" 23-1/2" PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Warming Drawer: 30" 23-1/2" Construct Solid Bottom Min. 3/8" Plywood Supported 25-1/4" by 2x4 or 2x2 Runners all Four Sides 25-1/4" 17-1/2" 2" Min. (3" recommended) Per warming drawer requirement 17-1/2" 36-3/4" Min. Construct Base Min. 3/8" Plywood Supported by 2x4 or 2x2 Runners all Four Sides • Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined installation. • Allow 2-1/8" case trim overlap on the sides and 7/8" overlap on the bottom of the opening for all models. Allow 1-1/4" case trim overlap on the top for models PSB2200 and PSB2201 and 3/4" overlap on the top for models ZSC2200, ZSC2201 and ZSC2202. • Oven overlaps will conceal cut edges on all sides of the opening. When installed over a single oven or a warming drawer, allow at least 2" between the two openings. This separation will provide clearance for bottom overlap of the Advantium 240V and the other appliance overlaps. 36-3/4" Min. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. Construct a solid oven floor of 3/8" min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

5
Installation Preparation
Preparation
WITHOUT
an Accessory Storage Drawer
PREPARE THE OPENING
(CONT.)
Installation over a GE/Monogram
Warming Drawer:
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
30”
23-1/2”
25-1/4”
17-1/2”
36-3/4”
Min.
2” Min.
(3” recommended)
Per warming
drawer
requirement
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported
by 2x4 or 2x2
Runners all
Four Sides
PREPARE THE OPENING
The Advantium 240V can be installed in
combination with other GE/Monogram appliances.
Always follow each product’s Installation
Instructions to complete the installation.
Single Advantium 240V Installation:
Order a 30” wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
• Always maintain 36-3/4” minimum height from
the floor to the cutout in any single or combined
installation.
• Allow 2-1/8” case trim overlap on the sides and
7/8” overlap on the bottom of the opening for all
models. Allow 1-1/4” case trim overlap on the top
for models PSB2200 and PSB2201 and 3/4”
overlap on the top for models ZSC2200, ZSC2201
and ZSC2202.
• Oven overlaps will conceal cut edges on all sides
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2” between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 240V and the other
appliance overlaps.
Construct a solid oven floor of 3/8” min. thick plywood
supported by 2 x 4
or 2 x 2 runners on all sides.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
30”
23-1/2”
25-1/4”
17-1/2”
Construct
Base
Min. 3/8”
Plywood
Supported
by 2x4 or 2x2
Runners all
Four Sides
36-3/4”
Min.