Haier AB282AEERA User Manual - Page 25
ÈÇÇ¿¿
View all Haier AB282AEERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
Installation Procedure For series AB242ACEAA, AB242ACERA, AB282ACEAA, AB482ACEAA, AB482AEERA, AB602ACEAA, AB602ACERA Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage. After wiring Check water drainage in cooling operation. When wiring is not complete Remove cover of control box, connect 1PH power to terminal 1 and 2 on terminal block.,use remote controller to operate the unit. Note, in this operation, fan will be running. Upon confirmation of a smooth water drainage, be sure to cut off power supply. Method of water charging Self-provided stiff pipe Maintenance Water drainage port for maintenance (Drain water from this hole) Inspecting hole 100mm Watering can of plastic pipe should be about 100 mm long Charge water from inspecting hole Charge water from air outlet 1 Connect with outdoor unit 3 D 2 Terminal block PCB on indoor unit Terminal block Cover of controll box For series 242, 282, 362,AB182ACERA) INDOOR UNIT 1 2 3 TERMINAL BLOCK Y/G OUTDOOR UNIT L N TERMINAL BLOCK 1 2 3 Y/G POWER SUPPLY: 1PH,220-230V~,50Hz For series 422, 482, 602 INDOOR UNIT TERMINAL BLOCK 1 2 3 Y/G OUTDOOR UNIT TERMINAL BLOCK R S TN 1 2 3 Y/G POWER SUPPLY: 380-400V,3N~,50Hz 23