HP AP775A Cisco Nexus 5000 Series Hardware Installation Guide (OL-15902-01, No - Page 104
Task No., Planning Activity, Verified By, Table D-1, Site Planning Checklist
UPC - 884962062708
View all HP AP775A manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 104 highlights
Site Preparation Checklist Appendix D Site Planning and Maintenance Records Send documentation comments to [email protected] Table D-1 Site Planning Checklist Task No. Planning Activity Verified By Time 1 Space evaluation: • Space and layout • Floor covering • Impact and vibration • Lighting • Maintenance access 2 Environmental evaluation: • Ambient temperature • Humidity • Altitude • Atmospheric contamination • Air flow 3 Power evaluation: • Input power type • Power receptacles1 • Receptacle proximity to the equipment • Dedicated circuit for power supply • Dedicated (separate) circuits for redundant power supplies • UPS2 for power failures 4 Grounding evaluation: • Circuit breaker size • CO ground (AC- powered systems) 5 Cable and interface equipment evaluation: • Cable type • Connector type • Cable distance limitations • Interface equipment (transceivers) 6 EMI3 evaluation: • Distance limitations for signaling • Site wiring • RFI4 levels 1. Verify that the power supply installed in the chassis has a dedicated AC source circuit. 2. UPS = uninterruptible power supply. Date Cisco Nexus 5000 Series Hardware Installation Guide D-2 OL-15902-01