HP AP775A Cisco Nexus 5000 Series Hardware Installation Guide, Cisco NX-OS Rel - Page 109

Small-Form-Factor Pluggable transceivers. See SFP, switch installation

Page 109 highlights

Index Send documentation comments to [email protected] length C-4 supported power cords (figure) C-5 supported power cords (table) C-4 power plugs supported power plugs (figure) C-5 power supplies blank filler panel (figure) 1-10, 1-26 description 1-9, 1-25 installing (procedure) 2-22 LED descriptions 1-10, 1-25, B-3 removing (procedure) 2-21 specifications B-2, B-3 pre-installation guidelines 2-2 options 2-2 unpacking the switch 2-4 R rack 2-5, 2-8 rack-mount installation procedure 2-6, 2-9 rack-mount kit contents 2-5, 2-8 records chassis serial number D-4 contact and site information D-3 site planning and maintenance D-1 required equipment switch installation 2-4 RJ-45 connector pinouts C-2 S screw torques description 2-4 SFP+ transceivers installing (procedure) 3-4 installing a cable (procedure) 3-6 maintaining 3-7 removing (procedure) 3-4 removing a cable (procedure) 3-6 specifications B-4 SFP transceivers description 3-7 installing (procedure) 3-7 installing a cable 3-6 removing (procedure) 3-8 removing a cable (procedure) 3-10 specifications B-4 supported 1-14, 1-28 site planning checklist D-2 Small-Form-Factor Pluggable transceivers. See SFP transceivers specifications cables C-1 environmental B-1 expansion modules B-2 physical B-1, B-2 power supplies B-2, B-3 transceivers B-4 switch installation equipment required 2-4 guidelines 2-3 screw torques 2-4 T transceivers, supported SFPs. See SFP transceivers troubleshooting best practices E-1 OL-15902-01 Cisco 5000 Series Hardware Installation Guide IN-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110

Send documentation comments to [email protected]
Index
IN-3
Cisco 5000 Series Hardware Installation Guide
OL-15902-01
length
C-4
supported power cords (figure)
C-5
supported power cords (table)
C-4
power plugs
supported power plugs (figure)
C-5
power supplies
blank filler panel (figure)
1-10, 1-26
description
1-9, 1-25
installing (procedure)
2-22
LED descriptions
1-10, 1-25, B-3
removing (procedure)
2-21
specifications
B-2, B-3
pre-installation
guidelines
2-2
options
2-2
unpacking the switch
2-4
R
rack
2-5, 2-8
rack-mount installation
procedure
2-6, 2-9
rack-mount kit
contents
2-5, 2-8
records
chassis serial number
D-4
contact and site information
D-3
site planning and maintenance
D-1
required equipment
switch installation
2-4
RJ-45 connector
pinouts
C-2
S
screw torques
description
2-4
SFP+ transceivers
installing (procedure)
3-4
installing a cable (procedure)
3-6
maintaining
3-7
removing (procedure)
3-4
removing a cable (procedure)
3-6
specifications
B-4
SFP transceivers
description
3-7
installing (procedure)
3-7
installing a cable
3-6
removing (procedure)
3-8
removing a cable (procedure)
3-10
specifications
B-4
supported
1-14, 1-28
site planning
checklist
D-2
Small-Form-Factor Pluggable transceivers. See SFP
transceivers
specifications
cables
C-1
environmental
B-1
expansion modules
B-2
physical
B-1, B-2
power supplies
B-2, B-3
transceivers
B-4
switch installation
equipment required
2-4
guidelines
2-3
screw torques
2-4
T
transceivers, supported SFPs. See SFP transceivers
troubleshooting
best practices
E-1