HP Designjet L26500 HP Designjet L26500 Printer series - Site preparation guid - Page 13

Checklist, Other requirements - rip software

Page 13 highlights

Electrical installation requirements Are the wall receptacles (wall sockets) placed close enough to the printer that the plugs can be plugged and unplugged easily? NOTE: The power cord length is 4.5 m (14.8 ft). Would the printer's built-in Residual Current Circuit Breaker (also known as Ground Fault Circuit Interrupter) operate in the case of a current leakage fault to the product chassis (even if an isolation device is installed)? Yes No (Required) (Required) Comments Electrical configuration requirements Yes No Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If so, is it correctly installed? Comments Networking and computer requirements Is the RIP computer and software ready for installation? Have network connections been supplied? Do you have a color sensor that is compatible with your RIP? Do you have a LAN cable long enough to connect the printer to the network? Yes No Comments Environmental requirements Have the temperature and humidity requirements been satisfactorily met in the print production area, and is there adequate ventilation or air conditioning? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Does the print production area have sufficient lighting? Yes No Comments Other requirements Have you arranged for supplies such as substrate and ink cartridges to be available on the day of installation? Have you met the requirements specified in this guide? Yes No (Required) Comments Checklist ENWW 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13

Electrical installation requirements
Yes
No
Comments
Are the wall receptacles (wall sockets) placed close enough to the printer
that the plugs can be plugged and unplugged easily?
NOTE:
The power cord length is 4.5 m (14.8 ft).
(Required)
Would the printer's built-in Residual Current Circuit Breaker (also known as
Ground Fault Circuit Interrupter) operate in the case of a current leakage
fault to the product chassis (even if an isolation device is installed)?
(Required)
Electrical configuration requirements
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If
so, is it correctly installed?
Networking and computer requirements
Yes
No
Comments
Is the RIP computer and software ready for installation?
Have network connections been supplied?
Do you have a color sensor that is compatible with your RIP?
Do you have a LAN cable long enough to connect the printer to the
network?
Environmental requirements
Yes
No
Comments
Have the temperature and humidity requirements been satisfactorily met in
the print production area, and is there adequate ventilation or air
conditioning?
Have the temperature and humidity requirements been satisfactorily met in
the storage area?
Is the print production area free from dirt and dust?
Does the print production area have sufficient lighting?
Other requirements
Yes
No
Comments
Have you arranged for supplies such as substrate and ink cartridges to be
available on the day of installation?
Have you met the requirements specified in this guide?
(Required)
ENWW
9
Checklist