HP Designjet L26500 HP Designjet L26500 Printer series - Site preparation guid - Page 8

RIP workstation characteristics, Networking, Printing supplies, Electrical configuration - ink cartridges

Page 8 highlights

Requirements RIP workstation characteristics The RIP computer and RIP software must be provided by the customer. Each RIP has specific requirements. Check with your RIP vendor to find out the requirements for the PC that you'll be using for the RIP station. Make sure that the RIP station is fully functional and ready for installation. Networking You are responsible for all networking requirements, and you must complete the following tasks: NOTE: In order to perform remote support, the printer must have access to the Internet using the LAN connection. ● Have a Gigabit Ethernet network ready for the day of installation. ● Provide a CAT-6 LAN cable to connect the printer to your LAN and RIP workstation. ● Provide a Gigabit Ethernet switch. Printing supplies The following supplies should be purchased in addition to the printer and should be available on the day of installation: ● Six HP 792 ink cartridges, one for each color: black, cyan, magenta, yellow, light cyan and light magenta. ● At least one roll of substrate to perform calibrations and printhead alignment during printer setup. Electrical configuration NOTE: An electrician is required for the setup and configuration of the building electrical system used to power the printer and also for printer installation. Make sure that your electrician is appropriately certified according to local regulations and supplied with all the information regarding the electrical configuration. Your printer requires the following electrical components to be supplied and installed by the customer, according to the Electrical Code requirements of the local jurisdiction of the country where the equipment is installed. Single phase power Table 2-3 Single phase line specifications Outside Japan Number of power cords 2 Input voltage 220-240 V~ (-10%+6%) Input frequency 50 / 60 Hz Maximum total power consumption for both power cords 4.8 kW Japan only 2 200 V (-10%+10%) 50 / 60 Hz 4.8 kW 4 Chapter 2 Site preparation requirements ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13

RIP workstation characteristics
The RIP computer and RIP software must be provided by the customer. Each RIP has specific
requirements. Check with your RIP vendor to find out the requirements for the PC that you'll be using for
the RIP station. Make sure that the RIP station is fully functional and ready for installation.
Networking
You are responsible for all networking requirements, and you must complete the following tasks:
NOTE:
In order to perform remote support, the printer must have access to the Internet using the LAN
connection.
Have a Gigabit Ethernet network ready for the day of installation.
Provide a CAT-6 LAN cable to connect the printer to your LAN and RIP workstation.
Provide a Gigabit Ethernet switch.
Printing supplies
The following supplies should be purchased in addition to the printer and should be available on the
day of installation:
Six HP 792 ink cartridges, one for each color: black, cyan, magenta, yellow, light cyan and light
magenta.
At least one roll of substrate to perform calibrations and printhead alignment during printer setup.
Electrical configuration
NOTE:
An electrician is required for the setup and configuration of the building electrical system used
to power the printer and also for printer installation. Make sure that your electrician is appropriately
certified according to local regulations and supplied with all the information regarding the electrical
configuration.
Your printer requires the following electrical components to be supplied and installed by the customer,
according to the Electrical Code requirements of the local jurisdiction of the country where the
equipment is installed.
Single phase power
Table 2-3
Single phase line specifications
Outside Japan
Japan only
Number of power cords
2
2
Input voltage
220-240 V~ (-10%+6%)
200 V (-10%+10%)
Input frequency
50 / 60 Hz
50 / 60 Hz
Maximum total power consumption for
both power cords
4.8 kW
4.8 kW
4
Chapter 2
Site preparation requirements
ENWW
Requirements