Site preparation requirements, Physical space requirements, Unloading route - specifications

Page 6 highlights

Requirements 2 Site preparation requirements Physical space requirements Unloading route The route between the unloading area of the printer and the installation site, including any corridors and doorways through which the printer must be transported, is important to proper site preparation and must be checked before the arrival of the printer. This pathway must be clear when the printer arrives. Table 2-1 Printer physical specifications Printer Length 2.47 m (97 in) Width 0.69 m (27.5 in) Height 1.37 m (54 in) Weight 290.1 kg (639.6 lb) With packaging 2.69 m (105.9 in) 0.81 m (31.9 in) 1.18 m (46.6 in) 403.1 kg (888.7 lb) Doorways: minimum width 1.01 m (40 in) × minimum height 1.67 m (66 in) required. The space required for assembly is 3 m (10 ft) in front and 1 m (3.5 ft) at the sides and rear. Most of the installation process requires one person, but four people are required to perform certain tasks. 2 Chapter 2 Site preparation requirements ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13

2
Site preparation requirements
Physical space requirements
Unloading route
The route between the unloading area of the printer and the installation site, including any corridors
and doorways through which the printer must be transported, is important to proper site preparation
and must be checked before the arrival of the printer. This pathway must be clear when the printer
arrives.
Table 2-1
Printer physical specifications
Printer
With packaging
Length
2.47 m (97 in)
2.69 m (105.9 in)
Width
0.69 m (27.5 in)
0.81 m (31.9 in)
Height
1.37 m (54 in)
1.18 m (46.6 in)
Weight
290.1 kg (639.6 lb)
403.1 kg (888.7 lb)
Doorways: minimum width 1.01 m (40 in) × minimum height 1.67 m (66 in) required.
The space required for assembly is 3 m (10 ft) in front and 1 m (3.5 ft) at the sides and rear.
Most of the installation process requires one person, but four people are required to perform certain
tasks.