HP Latex 1500 Site Preparation Checklist - Page 4

Checklist

Page 4 highlights

2 Checklist Address information Company name Street address City Country Postal code Telephone Fax E-mail Contact persons Company engineer or technician System administrator Operators to be trained on printer use and maintenance Name Telephone Email Printer HP Latex 1500 General access & equipment unloading Yes No Is there an easily accessible unloading area, with sufficient space to unload and maneuver the equipment? Has the route to the installation area been checked to meet all requirements (height, width, and clearance of ceilings, doorways, ramps, and corridors) and is the conveyance route clear? Is a power outlet available near the site where you plan to disassemble the crate (for the electric screwdriver used to disassemble the crate)? Have specialist movers been contracted to unload and move the equipment on the date required? Are the specialist movers aware of the specifications provided in this document? Is there enough space and manpower required to download the printer with the ramps? If a forklift is needed to unload the printer, has a suitable one been contracted for installation? If a forklift is needed, has the service part K4T88-67290 (forklift support) been ordered or provided by the reseller? Are there skates available to help position the crate? 2 Chapter 2 Checklist Comments ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

2
Checklist
Address information
Company name
Postal code
Street address
Telephone
City
Fax
Country
E-mail
Contact persons
Name
Telephone
Email
Company engineer or technician
System administrator
Operators to be trained on printer use and maintenance
Printer
HP Latex 1500
General access & equipment unloading
Yes
No
Comments
Is there an easily accessible unloading area, with sufficient space to unload and
maneuver the equipment?
Has the route to the installation area been checked to meet all requirements
(height, width, and clearance of ceilings, doorways, ramps, and corridors) and is the
conveyance route clear?
Is a power outlet available near the site where you plan to disassemble the crate
(for the electric screwdriver used to disassemble the crate)?
Have specialist movers been contracted to unload and move the equipment on the
date required?
Are the specialist movers aware of the specifications provided in this document?
Is there enough space and manpower required to download the printer with the
ramps?
If a forklift is needed to unload the printer, has a suitable one been contracted for
installation?
If a forklift is needed, has the service part K4T88-67290 (forklift support) been
ordered or provided by the reseller?
Are there skates available to help position the crate?
2
Chapter 2
Checklist
ENWW