HP Latex 1500 Site Preparation Checklist - Page 6

Checklist, Electrical installation, Comments, Networking requirements

Page 6 highlights

Electrical installation Is the chosen power system within its nominal range? Configuration 1 Configuration 2 Configuration 3 Configuration 4 Is the grounding conductor properly installed, as shown in the site preparation guide? Have you booked the services of an electrician for the day of installation? Is the electrician aware of all requirements and specifications highlighted in this document? Is the Power Distribution Unit (PDU) correctly installed? Are Residual-Current Circuit Breakers (RCCB), also known as Ground Fault Circuit Interrupters (GFCI), required by local laws? if so, have they a sensitivity of 100 mA or higher? Yes No Electrical configuration Yes No Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed? No power cords are supplied with the printer; does the electrician understand that power cord(s) must be provided according to printer specifications and local laws? If local regulations specify that you must use electrical plugs to connect the printer to the power supply, does the electrician have the required plugs ready for installation? Networking requirements Have network connections been supplied? Do you have a LAN cable long enough to connect the printer to the network? Do you have an Internet connection? Yes No Equipment preparation Is the air compressor or pressurized air line ready for the day installation? Have the correct supplies been ordered for deliver on or before the date of the printer's installation? Minimum requirements: 1 set of ink cartridges. Recommended: 1 set of ink cartridges, an extra set of ink cartridges, correct substrate for training purposes. Yes No Comments (Required) (Required) (Required) (Required) (Required) Comments Comments Comments 4 Chapter 2 Checklist ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Electrical installation
Yes
No
Comments
Is the chosen power system within its nominal range?
Configuration 1
Configuration 2
Configuration 3
Configuration 4
(Required)
Is the grounding conductor properly installed, as shown in the site preparation
guide?
(Required)
Have you booked the services of an electrician for the day of installation?
(Required)
Is the electrician aware of all requirements and specifications highlighted in this
document?
(Required)
Is the Power Distribution Unit (PDU) correctly installed?
(Required)
Are Residual-Current Circuit Breakers (RCCB), also known as Ground Fault Circuit
Interrupters (GFCI), required by local laws? if so, have they a sensitivity of 100 mA
or higher?
Electrical configuration
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed?
No power cords are supplied with the printer; does the electrician understand that
power cord(s) must be provided according to printer specifications and local laws?
If local regulations specify that you must use electrical plugs to connect the printer
to the power supply, does the electrician have the required plugs ready for
installation?
Networking requirements
Yes
No
Comments
Have network connections been supplied?
Do you have a LAN cable long enough to connect the printer to the network?
Do you have an Internet connection?
Equipment preparation
Yes
No
Comments
Is the air compressor or pressurized air line ready for the day installation?
Have the correct supplies been ordered for deliver on or before the date of the
printer's installation?
Minimum requirements
: 1 set of ink cartridges.
Recommended
: 1 set of ink cartridges, an extra set of ink cartridges, correct
substrate for training purposes.
4
Chapter 2
Checklist
ENWW