HP Latex 1500 Site Preparation Checklist - Page 7

Has the HP Scitex Caldera Grand RIP software v10 L5E74A been ordered, and is

Page 7 highlights

RIP requirements Has the HP Scitex ONYX Thrive 211 RIP Software (D9Z41A) been ordered, and is the computer to be used available with the required specifications? Has the HP Scitex Caldera Grand RIP software v10 (L5E74A) been ordered, and is the computer to be used available with the required specifications? If neither of the HP Scitex RIPs is to be used, is there a computer available with a RIP application installed that supports the printer? Do you have a spectrophotometer that is compatible with the RIP? Yes No Environmental requirements Yes No Have the temperature and humidity requirements been satisfactorily met in the print production area? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Does the print production area have sufficient lighting? Have you checked and met ventilation requirements specified in the site preparation guide? Have you met or exceeded all the requirements specified in the site preparation guide? Has the operator been enrolled on the WBT Latex fundamentals ? (Prerequisite for operator training). Date of site preparation completion Site preparation guide edition number or copyright date Customer signature Comments Comments (Required) (Required) ENWW 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

RIP requirements
Yes
No
Comments
Has the HP Scitex ONYX Thrive 211 RIP Software (D9Z41A) been ordered, and is
the computer to be used available with the required specifications?
Has the HP Scitex Caldera Grand RIP software v10 (L5E74A) been ordered, and is
the computer to be used available with the required specifications?
If neither of the HP Scitex RIPs is to be used, is there a computer available with a
RIP application installed that supports the printer?
Do you have a spectrophotometer that is compatible with the RIP?
Environmental requirements
Yes
No
Comments
Have the temperature and humidity requirements been satisfactorily met in
the print production area?
Have the temperature and humidity requirements been satisfactorily met in the
storage area?
Is the print production area free from dirt and dust?
Does the print production area have sufficient lighting?
Have you checked and met ventilation requirements specified in the site
preparation guide?
(Required)
Have you met or exceeded all the requirements specified in the site preparation
guide?
(Required)
Has the operator been enrolled on the WBT Latex fundamentals ? (Prerequisite for
operator training).
Date of site preparation completion
Site preparation guide edition number or copyright date
Customer signature
ENWW
5