HP rp5400 Site Preparation Guide - rp5400 - Page 28
Table 1-5, Site Inspection Checklist Continued
View all HP rp5400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 28 highlights
General Site Preparation Guidelines Site Inspection Table 1-5 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date Comment or Date 16 Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is there a dedicated branch circuit for equipment? 20. Is the dedicated branch circuit less than 250 feet (72.5 meters)? 21. Are the input circuit breakers adequate for equipment loads? Safety No. Area or condition Yes No 22. Is there an emergency power shut-off switch? 23. Is there a telephone available for emergency purposes? 24. Is there a fire protection system in the computer room? 25. Is antistatic flooring installed? 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, etc.)? Cooling No. Area or condition Yes No 27. Can cooling be maintained between 20 °C and 55 °C (up to 5000 ft.)? Derate 1 °C/1000 ft. above 5000 ft. and up to 10,000 ft. 28. Can temperature changes be held to 10 °C per hour with tape media? Can temperature changes be held to 20 °C per hour without tape media? 29. Can humidity level be maintained at 40% to 60% at 35 °C noncondensing? 30. Are air conditioning filters installed and clean? Storage 20 Chapter 1